Pacific Tug Group, PT Mary assists with new Brisbane CityCat terminal construction

Fitzgerald Construction Australia (FCA) using our crane pad to walk their piling rig off and their 250t crane onto their jackup barge. Pacific Tug Group’s, PT Mary then towed the barge up river to Howard Smith Wharf for the start of the new CityCat terminal FCA are building. A safe job done by all.